Construction of the Largest Wind Farm in Southeast Asia

Timelapse documentation prepared for Energy Development Corporation (EDC). However, this presentation represents the author's own edit. It is not the approved version of EDC. Features 50 units of Vestas V90 3MW wind turbines. Commissioned last November 5, 2014. The estimated cost for the construction of the wind farm was US$450 million.
Read more...

;